PROJECT NO
XYP/QTR-HD/FDN/159-2017 SCOPE OF WORK
Xypex Admix C-1000NF was mixed for durability of the concrete as the design life of the building is more than 30 years and the ground water level is -1 meter from GFL. 06 tons of Xypex Admix C-1000NF is being usedforprotection in the Raft Foundation, Retaining Walls & Water Tank.PRODUCT USED
XYPEX ADMIX C-1000NF
CLIENT: |
CONSULTANT: |
CONTRACTOR: |
SHK. JASSEM BIN FAISAL AL THANI |
|
|