Monday 29th of April 2024 06:52:18 AM

NEW HAMAD PORT PROJECT AT QATAR

Home / NEW HAMAD PORT PROJECT AT QATAR

PROJECT NO
XYP/QTR-HD/MARINE/130-2016
SCOPE OF WORK
QNPP QUAY WALL AND BASEMENT REVETMENTS – REPAIRING OF ALL EXISTING CRACKS BY XYPEX PATCH N PLUG & COATING OF ENTIRE EXPOSED CONCRETE TERMINAL DECK.
PRODUCT USED
XYPEX CONCENTRATE  & PATCH N PLUG

New Hamad Port Project in Qatar is one of the world’s largest ongoing greenfield developments, strategically located south of Doha with a span of 26.5 square kilometer area with a value of USD 7.4 billion. Xypex is selected by Engineering Design Consultant - Royal Haskoning DHV and Worley Parsons to provide protection and durability to exposed concrete terminals Deck areas and Quay walls. Initially Xypex materials have been used to repair all cracks over 0.2mm with Xypex Concentrate and Patch N Plug Drypac Solution in the exposed concrete deck areas. For durability and sustainability of the Concrete Terminal Decks on extremely harsh marine environment, Xypex Concentrate was coated throughout the 11 Terminal deck areas. Around 90 tons of Xypex Concentrate was used to protect the concrete & enhance durability.