PROJECT NO
XYP-QTR-FDN-192-2021SCOPE OF WORK
The Barwa Integrated Housing Project is a fast-track project to provide accommodation to the families of staff and the workforce involved in the preparations of the FIFA World Cup 2022. The project has 15 underground stormwater tanks made as a part of floor management system for this township. The fast completion of these tanks is essential for the timely delivery of infrastructure required to handover the project. Xypex Admix C1000 NF was chosen over the conventional waterproofing system for its simple execution and fast turnaround towards commissioning each tank thereby saving the critical time in the project. Nearly 75 tons of Xypex Admix has been used for waterproofing and concrete protection for these stormwater tanks the base slab, walls, columns and the concrete used in the precast beams and hollow core slab cover of these tanks.
PRODUCT USED
XYPEX ADMIX C 1000 NF