RESIDENTIAL TOWER AT AL MUNTAZAH (3B+G+7)

Home / RESIDENTIAL TOWER AT AL MUNTAZAH (3B+G+7)

PROJECT NO
XYP/QTR-HD/FDN/132-2016
SCOPE OF WORK
RAFTS AND WALLS
PRODUCT USED
XYPEX ADMIX C-1000NF & CONCENTRATE

Xypex Admix C-1000NF was mixed for durability of the concrete as the design life of the building is more than 50 years and the ground water level is -1 meter from GFL. Six tons of Xypex Admix C-1000NF was used as a second line of protection. Intermediate coat of Xypex Concentrate was applied throughout all joint areas.

 

CLIENT: CONSULTANT: CONTRACTOR:

H.H. ABDUL HADI SULAIMAN HAIDAR

GERMIN CONTRACTING