PROJECT NO
XYP/QTR-PROJ/DOCK/1024-ASCOPE OF WORK
DRY DOCK & SHIPYARDPRODUCT USED
XYPEX CONCENTRATE & PATCH N PLUGRoyal Haskoning DHV preferred Xypex Coating system to protect the concrete structure and enhance durability from harsh marine environment.
The structure is approx. 20 meters deep from the ground level and under severe hydrostatic pressure and exposed to severe chloride attack and high salinity. Two coats application of Xypex Concentrate was initiated after repairing of defective concrete with drypac system.